<br><br><div class="gmail_quote">On Sat, Sep 12, 2009 at 5:03 PM, Grozdan <span dir="ltr">&lt;<a href="mailto:neutrino8@gmail.com">neutrino8@gmail.com</a>&gt;</span> wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex;">
2009/9/12 Chengbin Zheng &lt;<a href="mailto:chengbinzheng@gmail.com">chengbinzheng@gmail.com</a>&gt;:<br>
<div><div></div><div class="h5">&gt; I&#39;m just curious, the student for the weighted p frame project didn&#39;t get to<br>
&gt; finish it before the end of SoC (according to the progress page), so does<br>
&gt; the student finish the project in his own time, or does a dev finishes it<br>
&gt; for him/her?<br>
<br>
</div></div>He&#39;ll finish it when he gets back on the 14th<br>
<br>
&gt; _______________________________________________<br>
&gt; x264-devel mailing list<br>
&gt; <a href="mailto:x264-devel@videolan.org">x264-devel@videolan.org</a><br>
&gt; <a href="http://mailman.videolan.org/listinfo/x264-devel" target="_blank">http://mailman.videolan.org/listinfo/x264-devel</a><br>
&gt;<br>
&gt;<br>
_______________________________________________<br>
x264-devel mailing list<br>
<a href="mailto:x264-devel@videolan.org">x264-devel@videolan.org</a><br>
<a href="http://mailman.videolan.org/listinfo/x264-devel" target="_blank">http://mailman.videolan.org/listinfo/x264-devel</a></blockquote><div><br></div><div> </div></div>Hi. <div><br></div><div>I would like to get an update to the weighted P frame prediction project. </div>
<div><br></div><div>Dylan said a week was needed, as it is almost done. A month has passed. Did you hit a roadblock or something, severely hindering the progress?</div><div><br></div><div>I don&#39;t mean to make Dylan hurry, I just would like an update. I totally understand how busy university is, and Dylan would have very limited time to work on it.</div>
<div><br></div><div>Chengbin.</div>