[x264-devel] Re: [PATCH] scene-cut cost

Laurent Aimar fenrir at via.ecp.fr
Wed Sep 29 18:03:13 CEST 2004


On Sat, Sep 25, 2004, Loren Merritt wrote:
> This patch makes scene-cut detection based on the relative cost of I-frame 
> vs P-frame, rather than just on the number of I-blocks used.
> It also makes the scene-cut threshold configurable.
> 
> This doesn't have a very large effect: Most scene cuts are obvious to 
> either algorithm. But I think this way is better in some less clear cut 
> cases, and sometimes finds a better spot for an I-frame than just waiting 
> for the max I-frame interval.
> 
> --Loren Merritt

 Applied. Thanks :)

-- 
fenrir

-- 
This is the x264-devel mailing-list
To unsubscribe, go to: http://developers.videolan.org/lists.html



More information about the x264-devel mailing list